click to enable zoom
loading...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next

Ksh. 0 to Ksh. 1,000,000,000

Ksh. 0 to Ksh. 1,000,000,000

We found 0 results. View results
Your search results

The New Nile cable stayed bridge

Posted by Mark Macharia on October 17, 2018
0

The New Nile Bridge is a cable stayed bridge which will align at 500 metres upstream of Nalubaale Dam with river width of 300 metres.The 525 metre-long bridge has a central span of 290 metres, end spans of 135 metres and 100 metres on the east and west banks respectively. The bridge’s foundation consists of

The post The New Nile cable stayed bridge appeared first on Construction Review Online.

Compare Listings