click to enable zoom
loading...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next

Ksh. 0 to Ksh. 1,000,000,000

Ksh. 0 to Ksh. 1,000,000,000

We found 0 results. View results
Your search results

South Africa completes 12,000m² Battery Park

Posted by Mark Macharia on February 13, 2019
0

South Africa has announced to have completed the 12,000m² Battery Park located at a key entrance way to the V&A Waterfront in Cape Town. Designed as the nucleus of a larger urban vision for the district by the Urban design and Architecture firm DHK, the site holds a park and piazza that effectively conceal a 1,206-bay parking facility, as well as

The post South Africa completes 12,000m² Battery Park appeared first on Construction Review Online.

Compare Listings