300MW Kam’mwamba coal-fired power project in Malawi underway
Construction works on the 300MW coal-fired power project Malawi is underway. This is according to Ambassador of the People’s Republic of China Liu Hongyang. “Kam’mwamba Coal-field Power Project is still alive and there, what we are doing is that we are doing some visibility studies on some infrastructure like roads, railways systems and other things […]
The post 300MW Kam’mwamba coal-fired power project in Malawi underway appeared first on Construction Review Online.
test