click to enable zoom
loading...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next

Ksh. 0 to Ksh. 1,000,000,000

Ksh. 0 to Ksh. 1,000,000,000

We found 0 results. View results
Your search results

Dualization work of Calabar-Itu-Ikot Ekpene road in Nigeria halts

Posted by Mark Macharia on July 12, 2019
0

Dualization works of Calabar-Itu-Ikot Ekpene federal road project linking the state with Cross River state in Nigeria. The road, which was constructed in the 70s, spans through Akwa Ibom and Cross River states. The Akwa Ibom section of the road is 12.2 kilometers, while the Cross River axis from Odukpani to the gas plant is […]

The post Dualization work of Calabar-Itu-Ikot Ekpene road in Nigeria halts appeared first on Construction Review Online.

Compare Listings