click to enable zoom
loading...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next

Ksh. 0 to Ksh. 1,000,000,000

Ksh. 0 to Ksh. 1,000,000,000

We found 0 results. View results
Your search results

EEP revives two turbines at the Tekezé hydroelectric power plant

Posted by Mark Macharia on May 27, 2019
0

Ethiopian Electric Power (EEP) has revived two turbines at the Tekezé hydroelectric power plant in northern Ethiopia after several months of total shut down Moges Mekonnen Alemu, Corporate Communications Director of EEP confirmed the reports and explained that three turbines were out of service mainly due to mechanical problems, caused in part by the drop […]

The post EEP revives two turbines at the Tekezé hydroelectric power plant appeared first on Construction Review Online.

Compare Listings