click to enable zoom
loading...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next

Ksh. 0 to Ksh. 1,000,000,000

Ksh. 0 to Ksh. 1,000,000,000

We found 0 results. View results
Your search results

Lakeside unveils Closed Loop Reactor Oxidation Ditch (CLR)

Posted by Mark Macharia on April 11, 2019
0

Lakeside has unveiled a new oxidation ditch, ‘the Closed Loop Reactor (CLR) Process’ which has a basic design that uses a simple racetrack configuration that provides a straight line flow pattern for wastewater between the headworks and the final clarifiers. The CLR has been featured with a single feed point for raw wastewater and return […]

The post Lakeside unveils Closed Loop Reactor Oxidation Ditch (CLR) appeared first on Construction Review Online.

Compare Listings