The New Nile cable stayed bridge
The New Nile Bridge is a cable stayed bridge which will align at 500 metres upstream of Nalubaale Dam with river width of 300 metres.The 525 metre-long bridge has a central span of 290 metres, end spans of 135 metres and 100 metres on the east and west banks respectively. The bridge’s foundation consists of
The post The New Nile cable stayed bridge appeared first on Construction Review Online.
test